You are here:Home >> FAQ

FAQ

FAQ

Contact us

Contact: Miss. Yang
Telephone: 13400343600
QQ account: 2843922398
Skype: bainawiremesh111
Email:[email protected]
Address: Kangtai International, New district, Baoding City

FAQ

Metal decorative mesh panel instaliiation

Time:2019-02-20 Views:1215
starting from the top of each wall,the top of the first row of the top of the list,from the bottom up.The second row of the top row of the wall is installed.After laying 10 rows of wall panels per device,you should view the cable once to eliminate errors in time.In order 
to ensure the quality of the wall appearance,the orientation of the bolts must be accurate,and the hook bolts of the single-sided construction are used to fix the bolts so that the  orientation of the bolts is horizontal and vertical.There are two main methods 
for fixing metal veneers.One is to screw the salts or square plates to the steel or wooden frame.This method is more durable and is mostly used for exterior walls.The other is to slap the slats on a special keel,which is mostly used indoors.
The gap between the plate and plate is ususlly 10 to 20mm,and is usually treated with a rubber strip or a sealing arrow elastic material.When the decorative panel is installed,care should be taken to cover it with plastic film in areas that are easily contaminated.Safety railings should be provided for parts that are easily scratched and touched.
  • Previous:What is Architectural Mesh  2023/10/08
  • Next:Application of metal decorative mesh  2019/02/20